2014 - 2017

Short- and medium-term planning for various open pits (hard stone)

 Germany, MHI AG (MHI Gruppe)

  Support of six open pits:

 - fact finding mission/data management

 - preparation and support of exploration campaigns

                - geological modelling (3D)

                - mine design/optimization of production

                - assessment/evaluation of geographical/operational data

                - preparation and support of authorization process

 

2013

Safety and Health Project (part IV)

 Germany, Open Grid Europe GmbH

 Preparation of instruction material:

 - working on gas pipelines

 - supplement and improve the integrated safety concept (8 modules)

 

2013

Rehabilitation Plan "Umzingwane River" (Tapin Mining/gold mining)

Zimbabwe, local mining consultant

3D deposit and mine modelling. Computer based reserve calculations for the Environment Management Authority (EMA):

 - processing surveying data 

 - creation of a "Mine Map"

 - development of a rehabilitation concept

 - creation of a "Rehabilitation Plan"

 

2013

Safety and Health Project (part III)

Germany, Open Grid Europe GmbH

Preparation of instruction material:

 - 8 different topics (working with hand tools, handling of load etc.)

 - development of concepts for 3 prevention campaigns

 

2012

Safety and Health Project (part II)

 Germany, Open Grid Europe GmbH (E.ON AG)

 Preparation of instruction material:

 - working on gas pipelines

 - development of an integrated safety concept

 - development of concepts for the IT- implementation of the safety concept

 

2012

Feasibility Study "AMBERGER KAOLINWERKE"

Germany, SST Prof. Stoll & Partner Ingenieurgesellschaft mbH

3D deposit and mine modelling. Computer based reserve calculations and planning for open pit shovel/truck systems:

 - mine design/optimization of production (western concessions)

 - waste and quality management

 - dump design

 

2012

Feasibility Report Neyveli Lignite Corporation Mine I & IA

 India, RE GmbH (RWE Power International) – part II

Feasibility Study about the technical and economic feasibility of an Inpit Crushing and Conveying (IPCC) System for two open coal pit:

- data management

- data processing

- creation of layouts

 

2011 - 2012

Feasibility Report Neyveli Lignite Corporation Mine I & IA

India, RE GmbH (RWE Power International) – part I

Feasibility Study about the technical and economic feasibility of an Inpit Crushing and Conveying (IPCC) System for two open coal pit:

- data management

- data processing

- creation of layouts

 

2011 - 2012

Safety and Health Project (part I)

 Germany, Open Grid Europe GmbH (E.ON AG)

 Preparation of instruction material:

- Globally Harmonized System (GHS)

- optimization of workstations

- working on gas pipelines

 

2011 - 2012

Expert’s report: Unconventional gas production

 Germany, federal state government North Rhine-Westphalia

 Description and assessment of technical aspects (Coalbed Methane and shale gas):

- drilling techniques

- stimulation techniques

- production techniques

 

2011

Feasibility Study Kerendari Blocks C&D

India, RE GmbH (RWE Power International)

Feasibility Study about the technical and economic feasibility of an Inpit Crushing and Conveying (IPCC) System for an open coal pit:

- dump design

- roadway optimization

- crusher positioning and conveyor system planning

 

2011

Feasibility Study Ekibastuz

Kazakhstan, SST Prof. Stoll & Partner Ingenieurgesellschaft mbH

3D deposit and mine modelling. Computer based reserve calculations and planning for open pit shovel/truck systems:

- Ekibastuz coal field II

- optimization of production (combination of field I and II)

- documentation (report)

 

2010 - 2011

Mine Master Plan “New Kovin“

Serbia, RE GmbH (RWE Power International)

Mine design for the wet extraction of bituminous coal:

- geological modelling

- mine design

- dump design

 

2010

Mine Master Plan “Carbones del Cerrejón Ltd.“

Colombia, RE GmbH (RWE Power International)

Feasibility Study about the technical and economic feasibility of an Inpit Crushing and Conveying (IPCC) System for three Open Pits:

- mine design

- dump design

- conveyor system geometry

 

2009 - 2010

R&D-Project “Haldengeothermie” (II)

Germany, Unit of Technology of Fuels (TEER, RWTH Aachen University)

Thermal use of smouldering fire inside old coal dumps, activities in the special fields:

- creation of sectional representations

- implementation of a 3D fire simulation

- installation of sensors on the dump

- remote maintenance of the sensors signals

 

2009 - 2010

Feasibility study: “CBM Münsterland”, IIA

Germany, Institute for Mine-Surveying (ifm, RWTH Aachen University)

Project phase IIA: Analysis of the financial risk of a CBM project in Germany (incl. Sensitivity analysis)

(Minegas GmbH, Mingas-Power GmbH, government of the federal state of North Rhine-Westphalia, Germany)

 

2009

Feasibility study: “Eastern Europe”

Russia, Kazakhstan, RE GmbH (RWE Power International)

Supportive activities in the special fields:

- scanning of analogue maps

- digitalisation of scanned maps

 

2009

Statement for the mining/fiscal authorities

Germany, Nivelsteiner Sandwerke und Sandsteinbrüche GmbH

Engineering opinion:

- scheduling open pit

- calculation of volumes and masses

- layout (mine surveyor aspects)

 

2009

R&D-Project “Haldengeothermie” (I)

Germany, Coking, Briquetting and Thermal Waste Treatment Group (TEER, RWTH Aachen University)

Thermal use of smouldering fire inside old coal dumps, activities in the special fields:

- concept of a 3D fire simulation

- supportive activities (R&D-Works)

- graphical representation of the R&D-results

 

2008

Special Operating Plan “Excavation”

Germany, Nivelsteiner Sandwerke und Sandsteinbrüche GmbH

Supportive activities in the special fields:

- scheduling open pit

- calculation of volumes and masses

 

2008

SurpacTM-Training

Vietnam, CBM GmbH

Designing a SurpacTM-training course for VINACOMIN, ITE, IMSAT and IMCC

Content:

- 3 Multimedia lessons geology/geological drillhole database/block modelling

- 3 Multimedia lessons open pit design

- 2 Multimedia lessons underground mine design

 

2008

Mine Master Plan “Open Pit Hongsa”

Laos, RE GmbH (RWE Power International)

Supportive activities in the special fields:

- scheduling open pit and dump

- scheduling mine drainage

- layout (mine surveyor aspects)

 

2007 - 2008

Pre-Feasibility study: CBM Münsterland

Germany, Institute for Mine-Surveying (ifm, RWTH Aachen University)

Investigation of technology for the production of gas from deep coal seams within the area of Münsterland, including project management

(Minegas GmbH, Mingas-Power GmbH, government of the federal state of North Rhine-Westphalia, Germany)

 

2007

Feasibility study: 3D deposit modelling

Germany, Department of Engineering Geology and Hydrogeology/LEK (RWTH Aachen University)

3D modelling of a geological barrier within a lignite deposit in the context of carbon capture and storage (CCS)

(RWE Power AG)

 

2006 - 2007

Treatment of geographical data of German coal mines

Germany, Institute for Mine-Surveying (ifm, RWTH Aachen University)

Treatment and digitization of mining areas, quality management, documentation, including project management

(Deutsche Steinkohle AG - DSK AG)

 

2006 - 2007

Planning engineer in different projects

SST Prof. Stoll & Partner Ingenieurgesellschaft mbH

3D deposit and mine modelling. Computer based reserve calculations and planning for open pit shovel/truck systems for:

- German limestone pits

- Turkish lignite pit

- African ore pit (Mauritania)

 